Comprehensive Surface Water Management Plan

Purpose and Overview

The Surface Water Management Plan has been developed to provide the City with direction concerning the administration and implementation of water resource activities within the City. This plan is intended to meet the requirements for a local surface water management plan as required by the Metropolitan Surface Water Management Act and be in conformance with Board of Water and Soil Resources (BWSR) Rules Chapter 8410.

Revised Engineer Guidelines-Atlas 14 Precipitation Frequency Estimates

2018 Rosemount Surface Water Management Plan
Surface Water Management Plan - Appendix A - Figures 1-6 
Surface Water Management Plan - Appendix A - Figures 7-12
Surface Water Management Plan - Appendix A - Figures 13-19 
Surface Water Management Plan - Appendix B
Surface Water Management Plan - Appendix C.1 
Surface Water Management Plan - Appendix C.2
Surface Water Management Plan - Appendix C.3 and C.4
Surface Water Management Plan - Appendix D-M
Surface Water Management Plan - Appendix N
Surface Water Management Plan - Appendix O-Q